Monday, October 7, 2019

Pass-On

 
 
  Pass-On
 
Date 10-06-2019
Pass-On Subject D-Shift: Sunday October 6th 2019
Pass-On Information •RS20-01 checked
•Work bench cleaned
•Misc. stuff done around the station
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Sunday, October 6, 2019

Pass-On

 
 
  Pass-On
 
Date 10-05-2019
Pass-On Subject C-Shift 10/5/19
Pass-On Information -HM20 weekly completed with no issues found.

-Extra 20/20 kits placed on HM20 in same compartment as sampling kit.

-Drager tubes moved to black Pelican case and placed with other Drager equipment.

-Supp203 threw a check engine light and seemed sluggish.  DJ notified.

-Missing 2 Motorola 8000 radios.  Might be on RS20 and were never taken off.
Name Otter
Email enginedriver71@comcast.net
 
     
 
 

Thursday, October 3, 2019

Pass-On

 
 
  Pass-On
 
Date 10-02-2019
Pass-On Subject D-Shift: Wednesday October 2nd 2019
Pass-On Information -U203 checked
-Rope drill
-Cleaned up from rope drill
-Cleaned up the loading dock and moved the equipment from the utility
-Hazmat washed
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Wednesday, October 2, 2019

Pass-On

 
 
  Pass-On
 
Date 10-01-2019
Pass-On Subject 10-1-19 Pass-On
Pass-On Information -BS20 & BT20 weekly completed with no new issues found.  Oil level still high.

-New sampling kit placed in service.  Old, out of date test packets removed.

-Did training w/ HFD.  Slice pack not working.  Battery charge dropped drastically.  Placed on charge on RS20 but battery may need to be replaced.

-Oxy-Acetylene spare O2 needs replaced.  Used at HFD training.
Name Otter
Email EngineDriver71@comcast.net
 
     
 
 

Sunday, September 29, 2019

Pass-On

 
 
  Pass-On
 
Date 09-28-2019
Pass-On Subject D Shift: Saturday September 28th 2019
Pass-On Information •HM20 checked. Meters calibrated, RAD meter charged.
•McCoy to county stations for Knox Box stuff
•House chores
•RS20-01, Skid20, U203 fueled
•MCC2 picked up from Lowe's and taken back to the warehouse
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Saturday, September 28, 2019

Pass-On

 
 
  Pass-On
 
Date 09-27-2019
Pass-On Subject C-Shift 9-27
Pass-On Information -Weekly completed on RS20 w/ no new issues found

-DEF added to HazMat20

-Rope equipment inventoried and made ready for drill

-Hazmat policies updated

-Rope policy completed
Name Otter
Email EngineDriver71@comcast.net
 
     
 
 

Wednesday, September 25, 2019

Pass-On

 
 
  Pass-On
 
Date 09-24-2019
Pass-On Subject D-Shift: Tuesday September 24th 2019
Pass-On Information -BS20 & BT20 checked. BS20's oil remains high
-Purchased new trailer lights for the rear of the gator trailer (one was out). They've been installed
-RS20-01 fueled
-Removed all the equipment from UT20
-Removed all the decals that needed to be removed. Some areas still need a little work
-Dry suit, PFD and helmet put away. Boots still drying
Name Austin McCoy
Email amccoy@washco-md.net