Sunday, May 12, 2019

EDIT: Pass-On

 
 
  Pass-On
 
Date 05-10-2019
Pass-On Subject C-Shift
Pass-On Information •  18 4x4s placed on collapse trailer.  
•  Engulfment cofferdam equipment removed from collapse trailer and placed on pallet and placed behind small squad.
•  (2) header/sole sets premade to 4' and placed in collapse trailer w/ wedge packs attached.  Stored in rear with wallers.
•  (1) Paslode gun OOS.  Would not fire.
•  Extra 4x4 lumber placed on rack behind hazmat unit.
Name David Olson
Email EngineDriver71@comcast.net
Upload Photo Header-Sole Setup.jpg
 
     
 
 

Friday, May 10, 2019

Pass-On

 
 
  Pass-On
 
Date 05-10-2019
Pass-On Subject C-Shift
Pass-On Information •  18 4x4s placed on collapse trailer.  
•  Engulfment cofferdam equipment removed from collapse trailer and placed on pallet and placed behind small squad.
•  (2) header/sole sets premade to 4' and placed in collapse trailer w/ wedge packs attached.  Stored in rear with wallers.
•  (1) Paslode gun OOS.  Would not fire.
•  Extra 4x4 lumber place don rack behind hazmat unit.
Name David Olson
Email EngineDriver71@comcast.net
Upload Photo Header-Sole Setup.jpg
 
     
 
 

Thursday, May 9, 2019

Pass-On

 
 
  Pass-On
 
Date 05-08-2019
Pass-On Subject A- shift
Pass-On Information UT- 203 checked

BS-20 fueled

Squad 20 Fueled

Ordered (30) 4x4x10 non-treated, kiln     dried southern yellow pine. It will be ready for pickup at Carter lumber on 5/9.

Training competed

Taught Hazmat refresher at Wash. Co. Sheriff's Dept. for Fire Police.

Boat 20 was requested to return too Knob Rd to assist in a continued search operation. Approved by Hart.



Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Monday, May 6, 2019

Pass-On

 
 
  Pass-On
 
Date 05-06-2019
Pass-On Subject May 6 2019
Pass-On Information • Supp 20-03 back from Statler's.  Rear lift back in service.
• (2) dry suits off BS20 drying from Inc#10001
• New wet-decon wastewater pump purchased and placed on HM20.
• (4) Toilet bowl wax rings placed on HM20 to seal punctured hydrocarbon fuel tanks.  When you use one please let Sam know so a replacement can be purchased.
• Collapse weekly completed.  Complete inventory done with several items missing of required numbers low.  Per Sam the following changes have been made:
o All large cones are now on Supp20-03.
o Lumber purchased to match listed inventory.
o Wallers placed back on trailer with associated pins and parts.
o EMS equipment removed.
o THERE ARE NO 4X4s ON THE TRAILER!  The ones that were on there are all warped, bowed, and twisted.  They are behind RS20-01 and are fair game to take.  Any remaining will be disposed of next week.
Name David Tyler Olson
Email EngineDriver71@comcast.net
 
     
 
 

Pass-On

 
 
  Pass-On
 
Date 05-06-2019
Pass-On Subject Antietam/Potomac St Closure
Pass-On Information For this week, Antietam and Potomac st will be closed for crane ops at the MD Theater.
Name Sam Anderson
Email sanderson@washco-md.net
 
     
 
 

Pass-On

 
 
  Pass-On
 
Date 05-05-2019
Pass-On Subject May 5 2019
Pass-On Information (2) 4x4 spot shores constructed on Inc#9957, 1822 Meridian Dr.  Many of the remaining 4x4s on collapse unit are bowed, twisted, and generally questionable for use.  New lumber is needed.
Name Dave Olson
Email EngineDriver71@comcast.net
 
     
 
 

Thursday, May 2, 2019

Pass-On

 
 
  Pass-On
 
Date 05-02-2019
Pass-On Subject Ethanol Free Fuel
Pass-On Information The grey flammable liquids cabinet is now behind the HAZMAT unit and has 25 gallons or so of ETHANOL free fuel. This is to replace TRU-FUEL canisters as they are ridiculously expensive. We will also have one 5 gallon gas can that will be designated as "mixed" (50:1).
Name Sam Anderson
Email sanderson@washco-md.net