Sunday, August 16, 2020

Pass-On

 
 
  Pass-On
 
Date 08-15-2020
Pass-On Subject B Shift Pass On
Pass-On Information -HM20 weekly completed.  The LCD is still slow to start but is quicker with the survey nozzle installed and not the rain cap.  Recommend this be the standard setup for a faster startup.

-Chlorine Safety (TRANSCAER) and new rope equipment training completed.  New rope equipment training to be conducted 8/17-8/21.

-Assisted Co10 with a CO incident.  Measured 11-15ppm for a 45 minute duration with the MX6 meters.  Both meters were re-calibrated upon return to the station.
Name Otter
Email dolson@washco-md.net
 
     
 
 

Wednesday, August 12, 2020

Pass-On

 
 
  Pass-On
 
Date 08-11-2020
Pass-On Subject A- crew
Pass-On Information Hose AO, McCoy EO

Daily and SCBA checks complete
    -fueled Boat 20C
    -AC in RS-20 not working

Daily log started

Weekly on BS and All boats
    -boats filled with air and motors started

Fueled RS-201 and UT-203

Picked up Citizens Response Trailer from highways
    and returned it to Elliott Pkwy.

Ran errands to Elliott Pkwy and the fire store

McCoy mounted a new magnetic mic holder on BS

Both Hose and McCoy completed Hazmat Training

3 calls, all boomerangs:

316 Kingswood Ter.                 House Fire
N. Cleveland @ Dual Hwy.           PIC
12734 SKIWAY Ave. (Franklin Co) machinery Acc.

Station choirs and weekly cleaning complete.

Daily Log completed, all reports and training entered in Firehouse.

Shift complete


Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Tuesday, August 11, 2020

Re: Apparatus Maintenance Request - Austin McCoy

 
  Apparatus Maintenance Request
 
Name Austin McCoy
Date 08-11-2020
Email amccoy@washco-md.net
Unit RS20
Unit Status In Service
Description of Issue Air conditioning does not work. Does not blow cold air
 
     
 
 

Sunday, August 9, 2020

EDIT: Pass-On

 
 
  Pass-On
 
Date 08-08-2020
Pass-On Subject A Shift Pass-on
Pass-On Information HM 20 weekly checkoff completed

new air fitting placed on HM20 air line.

Air pressure from tank air on the hazmat is 175 pis you need to use a regulator when using the air tools to prevent damaging them. the fitting to be able to use the the regulator with the air tools is in the top tool drawer on the hazmat.

HM 20 was washed.

HM 20 was fueled at county roads. when the rig reaches 3/4 tank of fuel it needs to be refueled before returning to the station no exceptions stop being lazy!

station chores were completed.


                           --- CALLS---

117 Summit ave. vehicle into a building. no services needed CO.20 placed in-service.

64 W. Antietam st. Apt. fire

14544 Greencastle pike tractor trailer fire.

Name Clay Shealy
Email cshealy@washco-md.net
 
     
 
 

Saturday, August 8, 2020

Pass-On

 
 
  Pass-On
 
Date 08-08-2020
Pass-On Subject A Shift Pass-on
Pass-On Information HM 20 weekly checkoff completed

new air fitting placed on HM20 air line.

Air pressure from tank air on the hazmat is 175 pis you need to use a regulator when using the air tools to prevent damaging them. the fitting to be able to use the the regulator with the air tools is in the top tool drawer on the hazmat.

HM 20 was washed.

HM 20 was fueled at county roads. when the rig reaches 3/4 tank of fuel it needs to be refueled before returning to the station no exceptions stop being lazy!

station chores were completed.


                           --- CALLS---

117 Summit ave. vehicle into a building. no services needed CO.20 placed in-service.


Name Clay Shealy
Email cshealy@washco-md.net
 
     
 
 

Pass-On

 
 
  Pass-On
 
Date 08-07-2020
Pass-On Subject C-Shift
Pass-On Information Rescue squad 20 checked-nothing noted, washed

Boat motor repaired, Boat 20 now in service.

Gutters assessed and found no blocks, simple a water volume issue. Need to be re directed elsewhere.

Dirty pump off performed, two barrels left at the scene for cleaning contractor. Hazmat re stocked. Air fitting solution being worked on by Olson.

RS 201 fueled at county roads.
Name Fraley/Hose
Email cfraley@washco-md.net
 
     
 
 

Wednesday, August 5, 2020

Pass-On

 
 
  Pass-On
 
Date 08-05-2020
Pass-On Subject A Shift Pass-on
Pass-On Information BT-20 OOS Both motors are OOS the 4 stroke is at bower for repair.  the 2 stroke is oos the boot will not go on.


BS20, RS20-1 refueled

HM20 washed.

1820 washed, fueled, and body light fixed.

MCFR dropped off a poly boot.

table top training was preformed with the hazmat chemical profile sheets

                            -calls-

Potomac river @ RT340 water rescue

7 E Washington st oven fire

staged on both calls no services needed from CO.20

Name Clay Shealy
Email cshealy@washco-md.net