Wednesday, August 5, 2020

Pass-On

 
 
  Pass-On
 
Date 08-05-2020
Pass-On Subject C-Shift
Pass-On Information Unit checks-nothing to repoort.

Masks delivered to go with the email

Hazmat was cleaned up and paperwork given to Sam

LCD worked well once it started up.

Hazmat back in service from Atlantic

HM, 201, rs20 fueled

Name Fraley/Hamrick
Email cfraley@washco-md.net
 
     
 
 

Saturday, August 1, 2020

Pass-On

 
 
  Pass-On
 
Date 07-31-2020
Pass-On Subject B Shift Pass On
Pass-On Information -No inicdent.

-RS20 weekly completed w/ no outstanding issues.

-Beaver Mechanical in station to service furnace.

-Alternator on RS20-01 replaced.  Work completed at EVS and unit is back in service.

-Axle on BT20A trailer to be replaced.  B-shift handling.
Name Otter
Email dolson@washco-md.net
 
     
 
 

Friday, July 31, 2020

Pass-On

 
 
  Pass-On
 
Date 07-30-2020
Pass-On Subject A-Shift, Thursday July 30th 2020
Pass-On Information •Apparatus checks

•Grass mowed & trimmed

•Doors, grabrails, etc wiped down. Downstairs mopped. Bathrooms cleaned

•To county admin building, Bowers Marine, The Fire Store and NAPA.

•Replaced the key for the Chesapeake. The key in there was bent and starting to crack.

•Replaced the battery on the Chesapeake. The old one was reported to be bad. We checked it with the tester and it showed "weak"

•RS20-01 fueled

•While enroute to a call, RS20-01's low voltage light came on and the voltage dropped below 12. A  lot of built up on the terminals of the battery, they were cleaned. Still no difference.

•LCD took 1.5 hours to start up


INCIDENTS:

House fire- Cancelled enroute

Driver: Hose

Officer: McCoy

3rd: Shealy
Name McCoy, Shealy, Hose
Email Amccoy
 
     
 
 

Thursday, July 30, 2020

Pass-On

 
 
  Pass-On
 
Date 07-29-2020
Pass-On Subject C-Shift
Pass-On Information 203 checked

LCD still taking 40 mins to sample.

XL level B suite taken from rack and boots from the shed to perform decon. 1811 requested ops for decon while she was on board 492.

203 delivered and picked up fans at the Fire Academy  

HM20 washed

Bays swept and blown out with leaf blower.

Chesapeake Boat Battery found dead by Ben. Austin and Keith are checking it today.

New Unit checks are completed and on the table for review. I would like to start them sometime in August.
Name Fraley/Hamrick
Email cfraley@washco-md.net
 
     
 
 

Monday, July 27, 2020

Pass-On

 
 
  Pass-On
 
Date 07-27-2020
Pass-On Subject A Shift Pass-on
Pass-On Information Check off complete on GTR20 and collapse 20.

House chores completed

RS20 to HGR for ARFF training

RS20 fulled

15204 clear spring road for an entrapment canceled enrout.



Name Clay Shealy
Email cshealy@washco-md.net
 
     
 
 

Sunday, July 26, 2020

Pass-On

 
 
  Pass-On
 
Date 07-23-2020
Pass-On Subject C-Shift
Pass-On Information 201-checked, no new issues found.

LCD ran for 6 hours

Fraley to warehouse for PPE inventory

Shelf was cleared off for sets of water equipment in case a large scale flooding event occurs. This set up is just starting, as time goes on this may be changed.

Boat motor didnt run that well on the creek. Couldnt get on plain with shallow water conditions.

Axle on boat 20A's is bent.

Handlight Batterey needs replaced
Name Fraley/Hamrick
Email cfraley@washco-md.net
 
     
 
 

Saturday, July 25, 2020

Pass-On

 
 
  Pass-On
 
Date 07-24-2020
Pass-On Subject A-Shift, Friday July 24th 2020
Pass-On Information -RS20 checked

-Apparatus checks

-BT20A still leaking air

-RS20-01 fueled

-HM20 filled with DEF & fuel


INCIDENTS:

Building fire: Electrical issue

Veh into building: Cancelled

House fire: Electrical issue
Name McCoy/Shealy
Email amccoy@washco-md.net