Friday, June 19, 2020

Pass-On

 
 
  Pass-On
 
Date 06-18-2020
Pass-On Subject D-Shift, Thursday June 18th 2020
Pass-On Information -Apparatus checks

-Rope training

-RS20-01 & Shealy to HGR for training

-RS20 washed

-Fridge cleaned out

-RS20-01 fueled

-Grass mowed


Incidents:

2-Box alarms. Nothing to them
Name McCoy/Shealy
Email amccoy@washco-md.net
 
     
 
 

Monday, June 15, 2020

Pass-On

 
 
  Pass-On
 
Date 06-14-2020
Pass-On Subject D-Shift, Sunday June 14th 2020
Pass-On Information -RS20-01 checked

-RS20 & BS20 fueled


-Checked WMD trailer

-BS20 washed



Incidents:
-Trail rescue/Cardiac arrest- Only used our manpower

-House fire- No equipment used

-Subj struck by train- No equipment used
Name McCoy/Shealy
Email amccoy@washco-md.net
 
     
 
 

Sunday, June 14, 2020

Pass-On

 
 
  Pass-On
 
Date 06-13-2020
Pass-On Subject C-Shift
Pass-On Information Fuel transferred from tote to yard tank.

Rain coat decon area, inside and outside cleaned up. Metal racks put back in shed. Used coats were placed in trash bags and placed by the decon area for Sam's direction.

Hazmat checked, fueled, and re-gen was performed. Meter B2 HCN readings bounced from -0.1 to 0.1 after zeroing the censors and calibrating. Spare was placed on unit in its place.

After giving Williamsport 14 bags of granular, Sam was notified of remaining supply. He wants the skid from the warehouse brought to the station.

Boat flashlights gathered, one put on charge after call. Flir battery charged.

As dirty N95 masks come in, place them in the training room on the right.

Name Fraley/Olson
Email cfraley@washco-md.net
 
     
 
 

Friday, June 12, 2020

Pass-On

 
 
  Pass-On
 
Date 06-11-2020
Pass-On Subject A-Shift
Pass-On Information Hose and Poff on

    Took 203 to Elliott pkwy to assist Chisholm.
        Loaded up new HVAC units and gloves. Both
        taken to Phoenix and unloaded.
   
    Equipment and SCBA checks
   
    Checked 203

    Cleaned and sanitized station

    Quarterly DOT inspection on MAB, no issues

    Yard maintenance complete

    1 decon (community action council van)
    vehicle into a building      Canceled in route

Shift complete

Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Thursday, June 11, 2020

Pass-On

 
 
  Pass-On
 
Date 06-10-2020
Pass-On Subject D-Shift, Wednesday June 10th 2002
Pass-On Information -U203 checked

-Downstairs bathroom cleaned

-To HFD Batt. Office

-To The Fire Store

-RS20-01 fueled

-Ran and pumped all of the gas powered trash pumps to make sure they work

-Pump sprayer for decon wouldn't seal for us and would just leak air out when you pumped it.

Incidents:

2- Decons

1- Box alarm(Couldn't respond due to decon)
Name McCoy/Shealy
Email amccoy@washco-md.net
 
     
 
 

Wednesday, June 10, 2020

Pass-On

 
 
  Pass-On
 
Date 06-09-2020
Pass-On Subject C-shift Pass On
Pass-On Information -BS20 & BT20 weekly completed.  Equipment from back seat of BS20 moved to rear of BS20 to make room for additional personnel.

-Chessie picked up from Phoenix and brought to station. Ran from River Bottom to Dam 5 with no issues.  Remaining in station for future training.  

-Container of dirty N95 mask in training room.  If any more are dropped of please place with these.  C-shift handling program.
Name Otter / Fraley
Email dolson@washco-md.net
 
     
 
 

Sunday, June 7, 2020

Pass-On

 
 
  Pass-On
 
Date 06-06-2020
Pass-On Subject D-Shift, Saturday June 6th 2020
Pass-On Information -HM20 checked. 4-MX6 meters calibrated, RID-Eye charged, portable batteries charged

-Apparatus checks

-3 SCBA cylinders filled

-RS20-01 fueled

-Worked on scheduling

-Grass mowed


Incidents:

-Water rescue on the Potomac near RT340. Cancelled enroute

-Lindsay Ln. house fire. Stagged manpower on the first call. Then dispatched again on the same incident number for it on fire again while E2 was still on scene. Stagged in the squad for that one.

-PIC on RT63, cancelled enroute
Name McCoy/Shealy
Email amccoy@washco-md.net