Saturday, May 30, 2020

Pass-On

 
 
  Pass-On
 
Date 05-29-2020
Pass-On Subject D-Shift, Friday May 29th 2020
Pass-On Information -RS20 checked. Light tower didn't want to pan & the ATC light was on. Dj made aware, advised it's been coming on and off, but the squad doesn't even have ATC, so not to worry about it.

-Upstairs and downstairs cleaned up

-All 3 HVAC filters changed

-Grass mowed

-Mower 20 fueled

-New locks put on sheds, gate and fuel tank. Now it is one key for all 4 locks. New electric lock box mounted on side of shed with key in it.
Name McCoy/Shealy
Email amccoy@washco-md.net
 
     
 
 

Friday, May 29, 2020

Pass-On

 
 
  Pass-On
 
Date 05-28-2020
Pass-On Subject C-Shift
Pass-On Information -Most water equipment put back on the boat support. If you are missing equipment check the boat support.

-Stokes on RS-20 was built to mirror our training set up.

-Approval for warehouse boat trailer to be used for little boat.

-One decon, Community action counsel transport bus.

-While on a call, made access to 340 launch and found it is better to pull in and turn around closer to the river, off the towpath.


Name Fraley/Olson
Email cfraley@washco-md.net
 
     
 
 

Wednesday, May 27, 2020

Pass-On

 
 
  Pass-On
 
Date 05-26-2020
Pass-On Subject A-crew
Pass-On Information Hose and Poff ON

   equipment and SCBA checks
   Checked BS, boat 20 and boat 20 A
         Inflated both boats
         Exercised Boat 20 motor.
         Boat 20A needs some seam work. I will
             be taking it out of service soon to patch
             them.
   Cleaned and Sanitized station

   Equipment put back on RS-20

   Filled DEF on HM-20

   Hazmat Call behind Pope Tire
        Acetylene tank was on fire, once out the
        relief valve wouldn't close.
        One 5 gal. Bucket and Salt Tub at training
             center. Used to transport leaking cylinder
             and cool it further.

   House Fire on Salem Ave. staged then placed in
        service.
 
     
Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Tuesday, May 26, 2020

Pass-On

 
 
  Pass-On
 
Date 05-25-2020
Pass-On Subject D-Shift, Monday May 25th 2020
Pass-On Information -Gator & Collapse checked. It appears there is new damage to the officer side front of the collapse trailer. Two holes and two spots lower near the stripe that was rubbed against.

-Apparatus checks
Name McCoy/Shealy
Email amccoy
 
     
 
 

Monday, May 25, 2020

Pass-On

 
 
  Pass-On
 
Date 05-24-2020
Pass-On Subject C-shift Pass On
Pass-On Information Classroom was setup for upcoming decon assignment.  Please leave it in the current configuration.  More info to come.

Responded to TT MVA with heavy entrapment.  100+ gallons of diesel offloaded after pt removed.  Offload pump was unable to move the diesel up the hill.  Portable pump placed in system as rely pump.  Needed to take filter adapters apart to build adapter on scene to get hoses to connect.  After return to station a filter adapters returned to normal and double male and double female adapters w/ shutoffs build and placed on unit.

Weekly completed on RS20-01.  
-Cutters Edge seems to be puking bar oil.  Cleaned and oil adjusted down to almost closed.  Keep an eye on it.  
-Please remember to refill the mix fuel cans when they get to ½.  Both were almost empty.  
-All cribbing is now on officers side over wheels (step chocks fell over and were blocking the extrication compartment door from opening).  
-Extra hand tools (shovels, trash hook, etc) moved to top shelf in drivers side over the wheel compartment.  
-Stokes with new bridle setup added.

Some equipment was moved around on HM20.  
-Trash cans and buckets from decon compartment up top w/ cones.  
-Wheeled cart added to decon compartment.  Handle can be attached with snap clip.
-Body bags removed from officers' side rear compartment.  
-Chem pump-off equipment and hydrocarbon fiber absorbent switched (keeps people away from the stay dry).  
-Chlorine kits and drum patching equipment switched (shelf damage from weight of Chlorine kits).
Name Otter / Fraley
Email dolson@washco-md.net
 
     
 
 

Friday, May 22, 2020

Pass-On

 
 
  Pass-On
 
Date 05-21-2020
Pass-On Subject D-Shift, Thursday May 21st 2020
Pass-On Information -Hazmat training 0800-1200

-McCoy worked on scheduling for a couple hours

-Shealy Mowed grass

-1 EMS call
Name McCoy/Shealy
Email amccoy
 
     
 
 

Thursday, May 21, 2020

Pass-On

 
 
  Pass-On
 
Date 05-20-2020
Pass-On Subject C-Shift
Pass-On Information 203 checked, still will occasionally shut off after starting. Siren O.O.S.

Squad 20 was expected back on 5/20 but was not delivered, confined space equipment is on bay floor

Water rescue skills day lesson plan was created and email sent out.

Both rigging and attendant bags were sealed. 540's were pulled and a double pulley was added to move towards mirrored 5:1 lines.

Hazmat training completed

Went to jobtown twice, hand tools sprayed off.  
Name Fraley/Olson
Email cfraley@washco-md.net