Saturday, May 16, 2020

Pass-On

 
 
  Pass-On
 
Date 05-15-2020
Pass-On Subject B-crew
Pass-On Information Hose (trade for DJ) and Hoop

    Apparatus checks
   
    Checked RS-20

    Blew out bays

    Washed RS-20 and BS-20

    Assisted HCC with unloading hospital beds

    Put the water fitting on the 2-stroke and ran
         Boat motor for 20min.
Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Friday, May 15, 2020

Pass-On

 
 
  Pass-On
 
Date 05-14-2020
Pass-On Subject A-Crew
Pass-On Information Hose and Poffinberger
   
    Apparatus and SCBA checks
        No face pieces on either RS. Can we put
        some spares back on in case someone
        forgets or damages theirs on a call?

    No weekly checks with UT-20 OOS
 
    Placed the concrete chainsaw back in service.
         I cleaned the spark plug and adjusted the
         gap spacing. I also adjusted the throttle
         (idle) speed. After working on it we allowed
         It to run for about 30 mins. Fueled it and
         placed it back on RS-20.

    Switched the cast Aluminum boot on the 2-
         stroke 40 with the rock proof off the EFI 40.
         Put the garden hose fitting in and did a run
         test on the motor.
         Remember to prime the fuel line with the
         bulb, then press in on the key for a few
         seconds to prime the carb. Doing both of
         these steps first the motor fires off no
         problem.

    if you guys are going to do more than turn it on
    and immediately shut it back off, the hose
    fitting has to be installed and cold water
    running to let it idle. The hose fitting doesn't
    supply enough water to allow you to throttle up
    but you can let it idle and move some gas
    Through the lines.

    Grass mowed
   
    Tire workout

    Station cleaned

    Two hazmat calls, one we assisted the owner in
    pumping fuel into a spare fuel cell.

    One PUI decon

Shift complete


 
   
Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Thursday, May 14, 2020

Pass-On

 
 
  Pass-On
 
Date 05-13-2020
Pass-On Subject D-Shift, Wednesday May 13th 2020
Pass-On Information •U203 checked-Siren not working. Found a loose wire. C shift will work on it on Saturday

•0900-1200 rope training at the training center

•McCoy worked on scheduling for a couple hours

•1 box alarm (no fire)

•1 decon. Exchanged 1 Medium raincoat. The dirty one was deconed and is hanging up out back to dry and air out
Name McCoy/Shealy
Email amccoy
 
     
 
 

Wednesday, May 13, 2020

Pass-On

 
 
  Pass-On
 
Date 05-12-2020
Pass-On Subject C-Shift
Pass-On Information -SCBA's were cleaned after finding debris in them from Prospect Street. Found front SCBA switched to the back without being cleaned.

-Lumber removed from 203 and placed back by the rack. Paslode gun was found off the trailer, dirty, case was empty of supplies, and with a dead battery. Items in the trailer were not put back from the fire on Prospect. This was also missed on the weekly checks with no notes made.

-Radio mant. was here and identifiers were changed. Two assigned to the Boat Support and Hazmat, and remaining four are to float.

-Looking into getting a connection for propane tanks when flaring them.

-Decon tent taken down and placed by gasoline cabinet in case needed.

-Two SCBA facepieces found in units. If you are missing yours, see Austin.
Name Fraley/Olson
Email cfraley@washco-md.net
 
     
 
 

Tuesday, May 12, 2020

EDIT: Pass-On

 
 
  Pass-On
 
Date 05-10-2020
Pass-On Subject A-crew
Pass-On Information Hose and Poffinberger ON.

    At the request of the FM's office we went to the
    fire scene at prospect st to assist FM's office
    with covering holes in the floor. They requested
    we assist with overhaul. we returned to the
    station around 1400.
          Used 3 sheet of plywood out of the collapse
          trailer.  3/4 x 4x8'  McCoy was notified.


    Cleaned tools and vent master off 201.
         vent master is missing the parts for the
         depth gauge but still in service.

    Weekly check on RS-201
    Cleaned SCBA regulators on 201
    Sanitized and cleaned station
 
    Fueled RS- 20
   
    Cleaned macro filter on HM-20

    Shift complete
   
   
Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Pass-On

 
 
  Pass-On
 
Date 05-10-2020
Pass-On Subject A-crew
Pass-On Information Hose and Poffinberger ON.

    At the request of the FM's office we went to the
    fire scene at prospect st to assist FM's office
    with covering holes in the floor. They requested
    we assist with overhaul. we returned to the
    station around 1400.
          Used 3 sheet of plywood out of the collapse
          trailer.  3/4 x 4x8'  McCoy was notified.


    Cleaned tools and vent master off 201.
         vent master is missing the parts for the
         depth gauge but still in service.

    Weekly check on 203
    Cleaned SCBA regulators on 201
    Sanitized and cleaned station
 
    Fueled RS- 20
   
    Cleaned macro filter on HM-20

    Shift complete
   
   
Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Pass-On

 
 
  Pass-On
 
Date 05-10-2020
Pass-On Subject A-crew
Pass-On Information Hose and Poffinberger ON.

    At the request of the FM's office we went to the
    fire scene at prospect st to assist FM's office
    with covering holes in the floor. They requested
    we assist with overhaul. we returned to the
    station around 1400.
          Used 3 sheet of plywood out of the collapse
          trailer.  3/4 x 4x8'  McCoy was notified.


    Cleaned tools and vent master off 201.
         vent master is missing the parts for the
         depth gauge but still in service.

    Weekly check on 203
    Cleaned SCBA regulators on 201
    Sanitized and cleaned station
 
    Fueled RS- 20
   
    Cleaned macro filter on HM-20

    Shift complete
   
   
Name Keith Hose
Email Khose@washco-md.net