Tuesday, May 12, 2020

Pass-On

 
 
  Pass-On
 
Date 05-10-2020
Pass-On Subject A-crew
Pass-On Information Hose and Poffinberger ON.

    At the request of the FM's office we went to the
    fire scene at prospect st to assist FM's office
    with covering holes in the floor. They requested
    we assist with overhaul. we returned to the
    station around 1400.
          Used 3 sheet of plywood out of the collapse
          trailer.  3/4 x 4x8'  McCoy was notified.


    Cleaned tools and vent master off 201.
         vent master is missing the parts for the
         depth gauge but still in service.

    Weekly check on 203
    Cleaned SCBA regulators on 201
    Sanitized and cleaned station
 
    Fueled RS- 20
   
    Cleaned macro filter on HM-20

    Shift complete
   
   
Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Sunday, May 10, 2020

Pass-On

 
 
  Pass-On
 
Date 05-09-2020
Pass-On Subject D-Shift, Saturday May 9th 2020
Pass-On Information •Hazmat checked. 4-MX6 meters calibrated

•Apparatus checks

•Rode around on hazmat 20 for an hour for hero appreciation

•Offloaded 50-75 gallons of fuel from a tractor trailer

•Ran a working fire. Items used: Two SCBAs, 2 hooks and the cutters edge saw off RS20-01. The chain guard on the saw came apart while in used by LT27.  Only able to find one part.

•A-Shift advised they'd take care of getting equipment cleaned up, Macro filter on hazmat cleaned and finish offloading the fuel on the hazmat (It was almost done). Thank you!!
Name McCoy/Shealy
Email Amccoy
 
     
 
 

Saturday, May 9, 2020

Pass-On

 
 
  Pass-On
 
Date 05-08-2020
Pass-On Subject C-shift Pass On
Pass-On Information -RS20 weekly completed w/ no new issues found.

-Concrete chain saw repaired and back in service on RS20

-3 new APEX8000 radios placed in service.  All APEX8000 radios will be reprogrammed with Franklin County channels and new aliases on Tuesday.

HM20 will have a total of 8 radios. The current 6 STX2500 for Level A suit operations remain unchanged.  2 new APEX8000 radios have been added for general operations as these have stronger transmitting power and will have a broader fleet map of mutual aid channels.  These 2 radios will have aliases of HM20 Foxtrot (HM20F) & HM20 Golf (HM20G).

BS20 will have a total of 3 radios.  The STX2500 that is setup for use with the water bag and headset remains.  2 new APEX8000 have been added. These radios water waterproof to 30' so they can be exposed to the water environment.

Support 20-03 will continue to have 1 STX2500.  No change there.

There will be 4 APEX8000 that are labeled CO20 Alpha thru Delta.  These are float radios designated for our everyday use.  They have not been assigned to a specific unit because we jump from unit to unit on a daily basis.  

There are also 5 spare STX2500 radios.  These will be stored somewhere in the station until needed.  New batteries for these will be purchsed in the coming weeks...I hope.
Name Olson / Fraley
Email dolson@washco-md.net
 
     
 
 

Thursday, May 7, 2020

Pass-On

 
 
  Pass-On
 
Date 05-06-2020
Pass-On Subject A-crew
Pass-On Information Hose and Poffinberger ON

    Apparatus and equipment checks
    SCBA checks
    Mowed grass
    Cleaned and sanitized station
    Weekly check on 203
    Fueled 201

No calls

Shift complete
Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Wednesday, May 6, 2020

Pass-On

 
 
  Pass-On
 
Date 05-05-2020
Pass-On Subject D-Shift, Tuesday May 5th 2020
Pass-On Information -BT20 & BS20 checked

-Apparatus checks

-Olson & Fraley to HFD training center to test out new airpacks

-Worked on some scheduling stuff

Name McCoy/Shealy
Email amccoy
 
     
 
 

Tuesday, May 5, 2020

EDIT: Pass-On

 
 
  Pass-On
 
Date 05-04-2020
Pass-On Subject C-Shift
Pass-On Information -Gator and Collapse checked, plastic and nails were added to collapse from 201.

-Wood strip on gator trailer will be coming soon

-One decon rack moved outside to provide 360 degree spraying without flipping the jacket.

-Bleach solution in the sprayer should be emptied after each decon and rinsed with fresh water.

-Foam pads are accounted for and should be picked up this week.

-WCSO unit 5501 was deconned PUI-Standard
Name Fraley/Olson
Email cfraley@washco-md.net
 
     
 
 

Pass-On

 
 
  Pass-On
 
Date 05-04-2020
Pass-On Subject C-Shift
Pass-On Information -Gator and Collapse checked, plastic and nails were added to collapse from 201.

-Wood strip on gator trailer will be coming soon

-One decon rack moved outside to provide 360 degree spraying without flipping the jacket.

-Bleach solution in the sprayer should be emptied after each decon and rinsed with fresh water.

-Foam pads are accounted for and should be picked up this week.

Name Fraley/Olson
Email cfraley@washco-md.net