Tuesday, March 24, 2020

Pass-On

 
 
  Pass-On
 
Date 03-23-2020
Pass-On Subject A-Crew
Pass-On Information Hose and Poffinberger
   
    Apparatus and SCBA checks completed
    Weekly check on Collapse and Gator
    Decon Training
    Cleaned the entire station and Lysoled
         all touchable surfaces
    2-stoke motor maintenance complete

    Gas powered equipment exercised on SQ 20 &
         RS-201
   
    Poff tapped new treads in for the decon area
         work light and re-assembled.

    I'm going to be re-gluing gaskets into Drysuits
         next shift. I needed more glue and finally
         finished making all the new molds. If you
         see suits laying out please leave them alone
         they need time to dry in between coats.
         
    One call to CHestnut Grove Rd "boomerang"
   
Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Monday, March 23, 2020

Pass-On

 
 
  Pass-On
 
Date 03-22-2020
Pass-On Subject D-Shift, Sunday March 22nd 2020
Pass-On Information -RS20-01 checked

-Apparatus checks

-Scheduling stuff throughout the day

-Assisted getting the decon stuff set up for deconing ambulances

-Tag removed from fuel tank. It's be discussed and the decision was made to use the fuel up until the tank reaches a half tank. Keep a half tank as a reserve.
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Sunday, March 22, 2020

Pass-On

 
 
  Pass-On
 
Date 03-21-2020
Pass-On Subject C-shift Pass On
Pass-On Information -Hazmat weekly completed. RIIDEye batteries were completely dead.  Might need to leave on charge.  C-shift will investigate further.

-BS20, RS20-01, HM20, and Sup20-03 fueled.

-Started to clear and rearrange bays for pending decon assignment.

-Multiple Level-B suits, additional water and MREs picked up from warehouse.

-Decon supplies ordered.

-Used 4 bags of granular on Inc#6447.  2 bags given to Co16 for replacement.  Replaced on HM20.

-80gal diesel offloaded into yard take from Inc#6479.

-180gal diesel offloaded into yard take and tote in shed from Inc#6494.  Yard tank is full, all additional fuel to be placed in tote in shed.
Name Olson / Fraley
Email EngineDriver71@comcast.net
 
     
 
 

Friday, March 20, 2020

Pass-On

 
 
  Pass-On
 
Date 03-19-2020
Pass-On Subject A-crew
Pass-On Information Hose and Poffenberger ON

    Apparatus checks
    Thoroughly cleaned and disinfected station
    Offloaded fuel into yard tank from D-crews
         pump off.
   
    Cleaned Macro filter
    Restocked Hazmat with sorbent

    COVID-19 Training

    Took a load of surplus to Phoenix, palletized it
    and placed in the cage.

    We were advised to Hoard fuel. Not to use the
    yard tank to fill apparatus.

    Took two office cubical panels to the airport

    Alerted for 2 building fires both were
         boomerangs

Shift complete

   
Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Thursday, March 19, 2020

Pass-On

 
 
  Pass-On
 
Date 03-18-2020
Pass-On Subject D-Shift, Wednesday March 18th 2020
Pass-On Information -U203 checked

-McCoy worked on scheduling throughout the day

-U203 to Carlise to pick up bottled water

-We now have 2 full skids of water locked in the cage in the bay

-Ran errands to Sam's Club, Martins, Lowes, DES & Eby's

-The generator from WMD trailer was picked up and put back on the trailer. The hole saw was picked up as well

-U203 fueled
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Wednesday, March 18, 2020

Pass-On

 
 
  Pass-On
 
Date 03-17-2020
Pass-On Subject C-Shift, Mach 17th 2020
Pass-On Information -BT20 & BS20 checked

-Apparatus checks

-Picked up tent from MMC, took it to the warehouse, picked up the tent they wanted, took it back to MMC.

-Gas cans in the station were empty. They've been filled

-Station yard tank is NOT to be used for refilling apparatus at this time per FOM Anderson

-Signs posted at CO20, CO25 & CO35

-RS20-01 fueled

-McCoy worked on PT scheduling

-PAPRs placed on HM. 3 compartment on driver side

-Ice machine torn apart and cleaned
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Monday, March 16, 2020

Pass-On

 
 
  Pass-On
 
Date 03-15-2020
Pass-On Subject A-Crew
Pass-On Information Hose and Poff ON

    Sanitized Station
    Equipment and SCBA's checked
    Poff did his N95 fit test
    Boat 20 filled with air- very low.
    Training: Zack Reid and C. Sipes Upstaffed
          Launched from river bottom.
          Four people in the boat creates a weight
                issue. Dropped to 3 and the problem
                went away.
          Worked on long turns, short turns on plane
                and J-turns. Worked on jumping up on
                plane in a small area. General ops
    Boat 20 after use maintenance completed
          Greased, fueled, filled 2 stroke oil, replaced
          missing fill port gaskets and greased them.
    Checked RS-201
    Sanitized the station before bed.
    Sanitized before shift change.

    1 call HFD BOX... yet again another boomerang

SHIFT COMPLETE
   


Name Keith Hose
Email Khose@washco-md.net