Sunday, February 23, 2020

Pass-On

 
 
  Pass-On
 
Date 02-22-2020
Pass-On Subject C-Shift, Saturday February 22nd 2020
Pass-On Information -HM20 checked

-Apparatus checks

-RS20-01 & BS20 washed
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Saturday, February 22, 2020

Pass-On

 
 
  Pass-On
 
Date 02-21-2020
Pass-On Subject A and B shift
Pass-On Information Hose and Poffinberger A shift and B Shift Hose and  Hoop

Station choirs completed both shifts.
Apparatus checks complete.
Checked RS 20
    Meters need calibrated but we are still out of
    gas....
training both days went good
online training complete

Ran several calls and all weren't really anything.

Fueled 201 twice

Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Thursday, February 20, 2020

Pass-On

 
 
  Pass-On
 
Date 02-19-2020
Pass-On Subject D-Shift, Wednesday February 19th 2020
Pass-On Information -U203 checked

-Apparatus checks

-Filled the station gas cans

-Upstairs cleaned

-New filter bought and put on the shop-vac

-Rope training

-Rid-eye batteries we removed from the device after talking to Sam. After doing a test, it appears the batteries are draining quickly when they are in the unit. If the batteries are out of the unit, they hold a charge a lot longer.
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Wednesday, February 19, 2020

Pass-On

 
 
  Pass-On
 
Date 02-18-2020
Pass-On Subject C-shift Pass On
Pass-On Information -BS20 & BT20 weekly completed.  No new issues.

-RS20-01 shelf strap installed.

-New 600' rope placed in service and on RS20.

-New trilinks placed on commercial anchor straps.

-MAB18 picked up from highways and returned to Phoenix.  Keep shore-line plugged in or batteries will die.
Name Olson / Fraley
Email dolson@washco-md.net
 
     
 
 

Monday, February 17, 2020

Pass-On

 
 
  Pass-On
 
Pass-On Subject 2-stroke Motor testing
Pass-On Information Hose and OcConnel

    Launch at River Bottom Park. Went up stream
    to dam 5 and back. Motor ran good. Shim
    placement is good.

    Top end of the throttle is tight, but manageable
   
    It runs 21 mph up stream at the current flow
    rate.
    EFI 4-stroke runs the same.

    I would like to leave this on as primary right
    right now, but it's something we should all
    discuss. It matters nothing to me.

    Only differences: manual trim, lighter, shifter
    placement and it jumps up on plane faster.

    Lift and lock the motor is your going to drag
    drag the motor past the roller.

    After use maintenance is complete, gas tank
    filled, oil filled, and greased.

Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Pass-On

 
 
  Pass-On
 
Date 02-16-2020
Pass-On Subject A-Crew
Pass-On Information Hose and Poffinberger ON
     Apparatus and SCBA check
     RS-201 Checked
         -5gas meter needs calibrated. H2S gas is
           empty. Will calibrate when new gas comes
          in.
         -All gas equipment ran and refueled
         -4 gas meter calibrated and zeroed
     
     Mixed fuel added to the small 50:1 can, filled      
     several old true fuel cans. They are on top the
     flammable cabinet.
     
     Fueled RS-201
     
**  Woodbridge Drive    House Fire    RS-201
     canceled in route

**  General Lee Dr.       House Fire     RS-201
     canceled in route

Shift Complete
Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Sunday, February 16, 2020

Pass-On

 
 
  Pass-On
 
Date 02-15-2020
Pass-On Subject D-Shift, Saturday February 16th 2020
Pass-On Information -HM20 checked, couple meters calibrated, however out of HCN gas.

-Apparatus checks

-House chores

-Started to remove some stuff from RS20-01. This was discussed to lighten up that unit and to remove stuff off of that unit that is no longer needed. See list beside pass on book of items removed so far.

-Some items on RS20-01 have been rearranged. Due to some heavy objects and not so strong shelves, we moved some items around for the time being to help keep any other damage from occurring.
Name Austin McCoy
Email amccoy@washco-md.net