Sunday, December 1, 2019

Pass-On

 
 
  Pass-On
 
Date 11-30-2019
Pass-On Subject C-shift Pass On
Pass-On Information -HM20 checked with no new issues found with rig.  Batteries for RIIDEye, MX6 meters, and portable radios all found low.  Will begin to charge all on both Saturday and following Wednesday shift to keep battery levels up.
-Plow checked and ready for Old Man Winter.  Placed in a position to mount on Sup20-03 when needed.
-Organized pile of equipment that was behind RS20.  These items will be moved to Phoenix or placed in their respective location in the station next week.
-2nd pallet jack moved to shed by fuel pump.
Name Otter
Email EngineDriver71@comcast.net
 
     
 
 

Sunday, November 24, 2019

Pass-On

 
 
  Pass-On
 
Date 11-24-2019
Pass-On Subject D shift pass on
Pass-On Information Hazmat check completed. meters need to be charged twice a week almost all meters were half charged or almost dead.

house chores were completed.

Olson killed Epstein for the Clinton's
Name Clay Shealy
Email cshealy@washco-md.net
 
     
 
 

Friday, November 22, 2019

Pass-On

 
 
  Pass-On
 
Date 11-22-2019
Pass-On Subject C-shift Pass On
Pass-On Information -New rope placed in service on both RS20 & RS20-01.  Seals placed on bags.

-Rigging and attendant bags for both RS20 & RS20-01 inventoried and seals placed on bags.

-Old rope is in training room.  Will be moved to Phoenix next week.

-Rope log will be kept in station from now on.  Location TBD.

-Silo rescue equipment bag out for repair.  Panels left next to 20-03 if needed.

-Hazmat meters batteries found low.  Charging may have to be twice a week.  

-16" Stihl saw from RS20 found marked OOS.  Repairs made and placed back in service.

-RS20-01 down 1 SCBA cylinder till Monday.  

-Epstein didn't kill himself.
Name Otter
Email enginedriver71@comcast.net
 
     
 
 

Wednesday, November 20, 2019

Pass-On

 
 
  Pass-On
 
Date 11-19-2019
Pass-On Subject D-Shift, Tuesday November 19th 2019
Pass-On Information -McCoy & Hose on at 0400hrs
-Anderson, Fraley, Olson & Shealy to BWI for ARFF
-Grain bin rescue training with HFD
-McCoy out for knox box stuff
-BS20 & BT20 checked
-BS20 fueled
-Grain bin training again
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Monday, November 18, 2019

Pass-On

 
 
  Pass-On
 
Date 11-17-2019
Pass-On Subject B-Shift, Sunday November 17th 2019
Pass-On Information -HM20's meters charged
-RS20-01 checked. 1-cylinder missing(needed to be filled by stairs) 2-cylinders were found empty.
-HM20 washed
-RS20-01 & BS20 inside cabs were cleaned
-2 scba cylinders filled
-6 scba cylinders were placed OOS due to needing hydro tested. 1-30min, 4-45min & 1-60min. There are now 3 cylinders missing from RS20.
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Saturday, November 16, 2019

Pass-On

 
 
  Pass-On
 
Date 11-15-2019
Pass-On Subject D-Shift, Friday November 15th 2019
Pass-On Information -Upstairs & downstairs cleaned
-Bay blown out
-RS20 checked
-Apparatus checks
-Meeting at 0900 for knox box stuff
-2-4x4's & 2- 1/2 sheets of plywood placed on collapse
-Station supplies purchased
-New light bulbs put into the burnt out lights (one in bay & one flood light outside the bay). There is still one light that is out in the rear of the bay, it is the light fixture itself that is bad.
-Placed "new" ems supplies in the ems bag on RS20-01. Also switched to a ems style bag. Please go over the supplies in that bag.
-RS20-01 & BS20 fueled
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Friday, November 15, 2019

Pass-On

 
 
  Pass-On
 
Date 11-14-2019
Pass-On Subject C-Shift
Pass-On Information HM-20 and 1820 to ARFF class
Whistles added to harnesses
RS-20, 203, HM fueled
skid of fluff brought over from warehouse
air filters changed
Name Fraley/Olson
Email cfraley@washco-md.net