Monday, November 18, 2019

Pass-On

 
 
  Pass-On
 
Date 11-17-2019
Pass-On Subject B-Shift, Sunday November 17th 2019
Pass-On Information -HM20's meters charged
-RS20-01 checked. 1-cylinder missing(needed to be filled by stairs) 2-cylinders were found empty.
-HM20 washed
-RS20-01 & BS20 inside cabs were cleaned
-2 scba cylinders filled
-6 scba cylinders were placed OOS due to needing hydro tested. 1-30min, 4-45min & 1-60min. There are now 3 cylinders missing from RS20.
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Saturday, November 16, 2019

Pass-On

 
 
  Pass-On
 
Date 11-15-2019
Pass-On Subject D-Shift, Friday November 15th 2019
Pass-On Information -Upstairs & downstairs cleaned
-Bay blown out
-RS20 checked
-Apparatus checks
-Meeting at 0900 for knox box stuff
-2-4x4's & 2- 1/2 sheets of plywood placed on collapse
-Station supplies purchased
-New light bulbs put into the burnt out lights (one in bay & one flood light outside the bay). There is still one light that is out in the rear of the bay, it is the light fixture itself that is bad.
-Placed "new" ems supplies in the ems bag on RS20-01. Also switched to a ems style bag. Please go over the supplies in that bag.
-RS20-01 & BS20 fueled
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Friday, November 15, 2019

Pass-On

 
 
  Pass-On
 
Date 11-14-2019
Pass-On Subject C-Shift
Pass-On Information HM-20 and 1820 to ARFF class
Whistles added to harnesses
RS-20, 203, HM fueled
skid of fluff brought over from warehouse
air filters changed
Name Fraley/Olson
Email cfraley@washco-md.net
 
     
 
 

Wednesday, November 13, 2019

Pass-On

 
 
  Pass-On
 
Date 11-12-2019
Pass-On Subject A-crew
Pass-On Information Hose and Poffinberger ON

Checked equipment and Boats

I-81 N   Fuel spill   HM 20

    Used 25 bags of Sorbent W to contain and
    Absorb the Residual diesel on the roadway.

Restocked Sorbent W

HFD came and took SQ 20 to training. We didn't make it due to the fuel spill.

Station Choirs complete

Structural collapse to Cortland Apartments
    built a Two post shore per the structural
    Engineer on scene.
    Used:
    (4) 4x4x10' posts
    (10) gusset plates
    (2) packs of matched wedges
    (2) full 4x8x1/2" sheets of plywood.
    (4) sticks of framing nails
Replaced:

    (10) gusset plates
    (2)   4x4x10' posts

Told Otter what they needed to buy to replace what we used.

Shift complete.    
Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Tuesday, November 12, 2019

Pass-On

 
 
  Pass-On
 
Date 11-11-2019
Pass-On Subject D-Shift, Monday November 11th 2019
Pass-On Information -Collapse & Gator checked. New check off sheets placed in binders.
-Apparatus checks
-Confined space training with HFD.
- SCBA cylinders filled
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Sunday, November 10, 2019

Pass-On

 
 
  Pass-On
 
Date 11-10-2019
Pass-On Subject C-Shift
Pass-On Information Daily Unit checks, no issues

Webbing cut for bags, inventory list typed

201 Checked-light tower O.O.S., one cord reel pulled off for repair

Multi gas cylinder empty, new one is ordered

201 washed, fueled

AED switched with utility 20's due to not having ped pads for AED

Short forms have been added in Appalachian trail map binder temporarily until I can get a metal clip board
Name Fraley/Olson
Email cfraley@washco-md.net
 
     
 
 

Pass-On

 
 
  Pass-On
 
Date 11-09-2019
Pass-On Subject B-Shift, Saturday November 9th 2019
Pass-On Information -HM20 checked. Meters & Rideye charged
-Apparatus checks
-House chores
Name Austin McCoy
Email amccoy@washco-md.net