Sunday, November 3, 2019

Pass-On

 
 
  Pass-On
 
Date 11-02-2019
Pass-On Subject C-Shift
Pass-On Information -RS20-01 fueled
-Apparatus checks
-HM20 checked. Meters calibrated and charged. Rid eye charged
-Continued station clean up
-Loaded U203 full of stuff and took the stuff to the warehouse.
-Floors swept and mopped, bay floor blown out, classroom cleaned
-Red boat placed on top of the other boat.
-Removed tote and drum from U203. That is now in the shed.
-Grain bin rescue device placed on U203
-Skid of absorbent placed on U203 for the winter season.
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Friday, November 1, 2019

Pass-On

 
 
  Pass-On
 
Date 10-31-2019
Pass-On Subject A SHIFT
Pass-On Information Hose and Poffinberger ON

Equipment and SCBAs checked

Ran all the chainsaws

Patched the transom on BT 20A
    Front left cross over line is leaking. If your    
    using it, simple break the connection in the
    middle of the crossover line and it will hold air
    without problems. If it remains connected it will
    lose air in the front left bow tube over about 2
    hours of time. At this point we are searching
    for a solution but the boat is in service.

Cleaned the Fridge out

Station chores completed

Two cylinders (out of surplus packs from utility 20)
Need filled

Grass was too wet to cut, we will take care of it our next shift.

400 blk Oak ridge Dr.  Fluid spill
2 Box                         House Fire

Shift complete


Name Keith Hose
Email Khose@washco-md.net
Upload Photo F0E4A15C-5A71-4819-824E-FEBA279766BE.jpeg
 
     
 
 

Thursday, October 31, 2019

Pass-On

 
 
  Pass-On
 
Date 10-30-2019
Pass-On Subject D-Shift: Wednesday October 30th 2019
Pass-On Information -U203 checked
-Apparatus checks
-0900-1330 tested all level A suits.
Total suits tested:17
Total suits passed: 12
Total suits failed: 5
-On the hazmat we now have the follow level A suits.  2-XL, 6-XXL and 4-XXXL
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Wednesday, October 30, 2019

Pass-On

 
 
  Pass-On
 
Date 10-29-2019
Pass-On Subject C-shift Pass On 10/29/19
Pass-On Information -All meters on HM20 calibrated after hazmat drill.

-Air unit filled all cylinders used during hazmat drill.

-6 A-suits airing out in training room.  S. Anderson advised he will be testing and placing back on HM20.

-4 MX6 meters re-calibrated again after TT hazmat fire on I81.

-2 pallets of speedy dry delivered and in U20 bay.

-BT20 adn BS20 checked with no new issues found.

-I could text Austin all this and speed up the process because he's the only other one that reads this.
Name Otter
Email EngineDriver71@comcast.net
Upload Photo 1.png
 
     
 
 

Sunday, October 27, 2019

Pass-On

 
 
  Pass-On
 
Date 10-26-2019
Pass-On Subject D-Shift:  October 26th 2019
Pass-On Information -Hazmat checked
-Inverter was not working again. Believe the power strip is bad. Used another power strip and now it's working fine.
-IT training
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Wednesday, October 23, 2019

Pass-On

 
 
  Pass-On
 
Date 10-22-2019
Pass-On Subject D-Shift: Tuesday October 22nd 2019
Pass-On Information -BT20 & BS20 checked
-Shealy: Hazmat research training
-Downstairs cleaned
-Table top exercise training
-The base station downstairs is now hooked up to the station amp and is running through the speakers. The old scanner has been turned off. This will help us hear transmission a lot better.
-About 250 gallons of fuel pumped into yard tank
-HM20 fueled and rinsed
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Tuesday, October 22, 2019

Pass-On

 
 
  Pass-On
 
Date 10-21-2019
Pass-On Subject 10-21 C-Shift Pass On
Pass-On Information -Gator and Collapse trailer weekly completed with no new issues.

-Meters on HM20 placed in Pelican box and moved to driver's side #2 compartment with other meters.  Compartment reorganized to fit meters.  Drum patch equipment moved to lower shelf and meters moved to middle shelf.

-Office area cleaned and items moved for better workspace.  Longer USB cable will be purchased to have printer/copier moved back by door.  Empty desk to be moved to Phoenix.

-MES serviced hydraulic tools.  Large ram from RS20-01 failed and taken for repair.

-Inverter on HM20 replaced.  Amperage increased due to multiple items charging.
Name Otter
Email EngineDriver71@comcast.net