Monday, June 24, 2019

Pass-On

 
 
  Pass-On
 
Date 06-23-2019
Pass-On Subject 6-23 Pass-On
Pass-On Information -RS20-01 weekly completed.  No new items to report. Fueled.

-Bay floors cleaned, grass cut.

-Tote on Supp 20-03 switched for cleaned tote.  

-Tote by dumpster cleaned.  Waiting for residual water to evaporate before placing in shed.

-Gator refueled after bike detail today.
Name Dave O
Email EngineDriver71@comcast.net
 
     
 
 

Friday, June 21, 2019

EDIT: Pass-On

 
 
  Pass-On
 
Date 06-20-2019
Pass-On Subject Thursday June 20th 2019
Pass-On Information •UT20 checked
•Assisted setting up a tent at the warehouse
•Took MAB18 to DES
•RS20-01 fueled
•Installed two SCBA brackets in the rear compartments of UT20. The Alpha side SCBA HUD does not work. We are limited on spare packs, that one was the best option.
•Picked up a skid of fiber from the warehouse.
•New AM/FM antenna installed on RS20.
•AED added to UT20.
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Pass-On

 
 
  Pass-On
 
Date 06-20-2019
Pass-On Subject Thursday June 20th 2019
Pass-On Information •UT20 checked
•Assisted setting up a tent at the warehouse
•Took MAB18 to DES
•RS20-01 fueled
•Installed two SCBA brackets in the rear compartments of UT20. The Alpha side SCBA HUD does not work. We are limited on spare packs, that one was the best option.
•Picked up a skid of fiber from the warehouse.
•New AM/FM antenna installed on RS20.
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Thursday, June 20, 2019

Re: Apparatus Maintenance Request - Austin McCoy

 
  Apparatus Maintenance Request
 
Name Austin McCoy
Date 06-20-2019
Email amccoy@washco-md.net
Unit SUP203
Unit Status In Service
Description of Issue After U203 sits for awhile, once you start it, it shuts off. You go to start it again and it cranks for a little while and then starts. Seems like it may be loosing the prime for the fuel or something along those lines.
 
     
 
 

Re: Apparatus Maintenance Request - Austin McCoy

 
  Apparatus Maintenance Request
 
Name Austin McCoy
Date 06-20-2019
Email amccoy@washco-md.net
Unit HM20
Unit Status In Service
Description of Issue The air leak on HM20 has gotten worse. It looses a lot of air during driving.
 
     
 
 

Pass-On

 
 
  Pass-On
 
Date 06-19-2019
Pass-On Subject 6-19-19 Pass-On
Pass-On Information -20-03, BS20, UT20 interior and compartments detailed.

-250gal diesel off-loaded into yard tank from Inc#13984.  Aluminum housing pump was not stripped down due to good quality of diesel recovered.

-Small metal drum inside large metal salvage drum used for diesel recovery.  Still has residual left in it.  Use caution is needed for anything other than a hydrocarbon.

-20HP jet motor for BT20A out of station for mounting to hand-truck.

-Bay floor weekly to be completed Saturday due to time constraints.

-Secondary fuel tote rinsed and drained.  When all standing water has evaporated, it should be switch with the current tote on 20-03.  That tank needs to be rinsed out due to debris as well.
Name Dave O
Email enginedriver71@comcast.net
 
     
 
 

Monday, June 17, 2019

Pass-On

 
 
  Pass-On
 
Date 06-16-2019
Pass-On Subject Sunday June 16th 2019
Pass-On Information •RS20-01 fueled
•RS20-01 checked
•4 way plug for the collapse trailer emergency lights was left plugged into U203 and then was ripped out. That has been repaired.
Name Austin McCoy
Email Amccoy@washco-md.net