Date 05-16-2019
Pass-On Subject A-Crew
Pass-On Information - Apparatus checked
- SCBA's checked
- yard mowed and bailed
- station choirs complete
- training 0900-1130
- bagged up 2000 of the red ready kits
     * distributed them to station reps at
        the association meeting at E-5.

**NO CALLS**
Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Monday, May 13, 2019

Pass-On

 
 
  Pass-On
 
Date 05-12-2019
Pass-On Subject A-crew
Pass-On Information Hose detailed to EMT-refresher 8-2.
Shealy(daylight)/Poffinberger
Station choirs completed
Squad 20-01 checked
- did not wash with the rainy weather.
No calls
Worked on new decals for the Chesapeake, ordering those soon.

Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Sunday, May 12, 2019

EDIT: Pass-On

 
 
  Pass-On
 
Date 05-10-2019
Pass-On Subject C-Shift
Pass-On Information •  18 4x4s placed on collapse trailer.  
•  Engulfment cofferdam equipment removed from collapse trailer and placed on pallet and placed behind small squad.
•  (2) header/sole sets premade to 4' and placed in collapse trailer w/ wedge packs attached.  Stored in rear with wallers.
•  (1) Paslode gun OOS.  Would not fire.
•  Extra 4x4 lumber placed on rack behind hazmat unit.
Name David Olson
Email EngineDriver71@comcast.net
Upload Photo Header-Sole Setup.jpg
 
     
 
 

Friday, May 10, 2019

Pass-On

 
 
  Pass-On
 
Date 05-10-2019
Pass-On Subject C-Shift
Pass-On Information •  18 4x4s placed on collapse trailer.  
•  Engulfment cofferdam equipment removed from collapse trailer and placed on pallet and placed behind small squad.
•  (2) header/sole sets premade to 4' and placed in collapse trailer w/ wedge packs attached.  Stored in rear with wallers.
•  (1) Paslode gun OOS.  Would not fire.
•  Extra 4x4 lumber place don rack behind hazmat unit.
Name David Olson
Email EngineDriver71@comcast.net
Upload Photo Header-Sole Setup.jpg
 
     
 
 

Thursday, May 9, 2019

Pass-On

 
 
  Pass-On
 
Date 05-08-2019
Pass-On Subject A- shift
Pass-On Information UT- 203 checked

BS-20 fueled

Squad 20 Fueled

Ordered (30) 4x4x10 non-treated, kiln     dried southern yellow pine. It will be ready for pickup at Carter lumber on 5/9.

Training competed

Taught Hazmat refresher at Wash. Co. Sheriff's Dept. for Fire Police.

Boat 20 was requested to return too Knob Rd to assist in a continued search operation. Approved by Hart.



Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Monday, May 6, 2019

Pass-On

 
 
  Pass-On
 
Date 05-06-2019
Pass-On Subject May 6 2019
Pass-On Information • Supp 20-03 back from Statler's.  Rear lift back in service.
• (2) dry suits off BS20 drying from Inc#10001
• New wet-decon wastewater pump purchased and placed on HM20.
• (4) Toilet bowl wax rings placed on HM20 to seal punctured hydrocarbon fuel tanks.  When you use one please let Sam know so a replacement can be purchased.
• Collapse weekly completed.  Complete inventory done with several items missing of required numbers low.  Per Sam the following changes have been made:
o All large cones are now on Supp20-03.
o Lumber purchased to match listed inventory.
o Wallers placed back on trailer with associated pins and parts.
o EMS equipment removed.
o THERE ARE NO 4X4s ON THE TRAILER!  The ones that were on there are all warped, bowed, and twisted.  They are behind RS20-01 and are fair game to take.  Any remaining will be disposed of next week.
Name David Tyler Olson
Email EngineDriver71@comcast.net
 
     
 
 

Pass-On

 
 
  Pass-On
 
Date 05-06-2019
Pass-On Subject Antietam/Potomac St Closure
Pass-On Information For this week, Antietam and Potomac st will be closed for crane ops at the MD Theater.
Name Sam Anderson