Tuesday, June 30, 2020

Pass-On

 
 
  Pass-On
 
Date 06-29-2020
Pass-On Subject B/C-Shift
Pass-On Information -201's mx6 is dead, Morgan notified

-Rope, Confined Space, Stokes and SCBA equipment on rack was loaded onto skids and taken to the warehouse.

-Hose serviced the chain saw after fire

-201's Driver's side first compartment has been set up for driver's gear and airpack. Hand tools moved from the cab to accommodate three people better. Picketts placed in red and black bag on the lower shelf, over the tire.

-5 Bags of granular brought here from warehouse to restock while full skid is on order.

-RS201 hand light was pulled from unit due to losing charge and being dead.    
Name Fraley/Hose/McCoy
Email cfraley@washco-md.net
 
     
 
 

Thursday, June 25, 2020

Pass-On

 
 
  Pass-On
 
Date 06-25-2020
Pass-On Subject C-Shift
Pass-On Information -Unit checks, 201 meter back on

-All equipment from the drill has been washed, put away and bags sealed.

-201 to warehouse to assist with folding up hospital tents.

-PFD's are in the training room and are numbered. Match your helmet number with the pfd number.

-Olson off/McCoy on duty

-201 to ECC for Scott SCBA presentation

-grass mowed, air filters changed, 201 fueled
Name Fraley/Olson
Email cfraley@washco-md.net
 
     
 
 

Tuesday, June 23, 2020

Pass-On

 
 
  Pass-On
 
Date 06-22-2020
Pass-On Subject D-Shift, Monday June 22nd 2020
Pass-On Information • Checked the gator and collapse

•Apparatus checks

•Shealy derailed Anderson's vehicle

•McCoy and Anderson to IT (downtown) and Rj Locks


Incidents:

1- Box alarm, cancelled enroute
Name McCoy/Shelay
Email Amccoy
 
     
 
 

Monday, June 22, 2020

Pass-On

 
 
  Pass-On
 
Date 06-21-2020
Pass-On Subject C-Shift
Pass-On Information -Hazmat Rack organized, most of items put in the first shed.

-Lime paced in blue jugs for acids spills

- Rope Training

-201 has one bulb out on the light tower

-HCN gas empty, 201's meter overdue

-Discussed modifying 201 driver's compartment to make it easier for driver to get ppe on.

-Airport response from ops is in the planning phase.
Name Fraley/Olson
Email cfraley@washco-md.net
 
     
 
 

Saturday, June 20, 2020

Pass-On

 
 
  Pass-On
 
Date 06-19-2020
Pass-On Subject A-Shift, Friday June 19th 2020
Pass-On Information -Apparatus checks and station cleaning

-RS20-01 fueled
Name Poffinberger & Burger/McCoy
Email amccoy
 
     
 
 

Friday, June 19, 2020

Pass-On

 
 
  Pass-On
 
Date 06-18-2020
Pass-On Subject D-Shift, Thursday June 18th 2020
Pass-On Information -Apparatus checks

-Rope training

-RS20-01 & Shealy to HGR for training

-RS20 washed

-Fridge cleaned out

-RS20-01 fueled

-Grass mowed


Incidents:

2-Box alarms. Nothing to them
Name McCoy/Shealy
Email amccoy@washco-md.net
 
     
 
 

Monday, June 15, 2020

Pass-On

 
 
  Pass-On
 
Date 06-14-2020
Pass-On Subject D-Shift, Sunday June 14th 2020
Pass-On Information -RS20-01 checked

-RS20 & BS20 fueled


-Checked WMD trailer

-BS20 washed



Incidents:
-Trail rescue/Cardiac arrest- Only used our manpower

-House fire- No equipment used

-Subj struck by train- No equipment used
Name McCoy/Shealy
Email amccoy@washco-md.net
 
     
 
 

Sunday, June 14, 2020

Pass-On

 
 
  Pass-On
 
Date 06-13-2020
Pass-On Subject C-Shift
Pass-On Information Fuel transferred from tote to yard tank.

Rain coat decon area, inside and outside cleaned up. Metal racks put back in shed. Used coats were placed in trash bags and placed by the decon area for Sam's direction.

Hazmat checked, fueled, and re-gen was performed. Meter B2 HCN readings bounced from -0.1 to 0.1 after zeroing the censors and calibrating. Spare was placed on unit in its place.

After giving Williamsport 14 bags of granular, Sam was notified of remaining supply. He wants the skid from the warehouse brought to the station.

Boat flashlights gathered, one put on charge after call. Flir battery charged.

As dirty N95 masks come in, place them in the training room on the right.

Name Fraley/Olson
Email cfraley@washco-md.net
 
     
 
 

Friday, June 12, 2020

Pass-On

 
 
  Pass-On
 
Date 06-11-2020
Pass-On Subject A-Shift
Pass-On Information Hose and Poff on

    Took 203 to Elliott pkwy to assist Chisholm.
        Loaded up new HVAC units and gloves. Both
        taken to Phoenix and unloaded.
   
    Equipment and SCBA checks
   
    Checked 203

    Cleaned and sanitized station

    Quarterly DOT inspection on MAB, no issues

    Yard maintenance complete

    1 decon (community action council van)
    vehicle into a building      Canceled in route

Shift complete

Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Thursday, June 11, 2020

Pass-On

 
 
  Pass-On
 
Date 06-10-2020
Pass-On Subject D-Shift, Wednesday June 10th 2002
Pass-On Information -U203 checked

-Downstairs bathroom cleaned

-To HFD Batt. Office

-To The Fire Store

-RS20-01 fueled

-Ran and pumped all of the gas powered trash pumps to make sure they work

-Pump sprayer for decon wouldn't seal for us and would just leak air out when you pumped it.

Incidents:

2- Decons

1- Box alarm(Couldn't respond due to decon)
Name McCoy/Shealy
Email amccoy@washco-md.net
 
     
 
 

Wednesday, June 10, 2020

Pass-On

 
 
  Pass-On
 
Date 06-09-2020
Pass-On Subject C-shift Pass On
Pass-On Information -BS20 & BT20 weekly completed.  Equipment from back seat of BS20 moved to rear of BS20 to make room for additional personnel.

-Chessie picked up from Phoenix and brought to station. Ran from River Bottom to Dam 5 with no issues.  Remaining in station for future training.  

-Container of dirty N95 mask in training room.  If any more are dropped of please place with these.  C-shift handling program.
Name Otter / Fraley
Email dolson@washco-md.net
 
     
 
 

Sunday, June 7, 2020

Pass-On

 
 
  Pass-On
 
Date 06-06-2020
Pass-On Subject D-Shift, Saturday June 6th 2020
Pass-On Information -HM20 checked. 4-MX6 meters calibrated, RID-Eye charged, portable batteries charged

-Apparatus checks

-3 SCBA cylinders filled

-RS20-01 fueled

-Worked on scheduling

-Grass mowed


Incidents:

-Water rescue on the Potomac near RT340. Cancelled enroute

-Lindsay Ln. house fire. Stagged manpower on the first call. Then dispatched again on the same incident number for it on fire again while E2 was still on scene. Stagged in the squad for that one.

-PIC on RT63, cancelled enroute
Name McCoy/Shealy
Email amccoy@washco-md.net
 
     
 
 

Saturday, June 6, 2020

Pass-On

 
 
  Pass-On
 
Date 06-05-2020
Pass-On Subject C-Shift
Pass-On Information Do not plug in back up camera on RS-20, there is a short and it will start to burn up

Light tower was half working, found the breaker was tripped. Any future issues check the breaker.

3/5 SCBA found with dirt and debris along with dirty hand tools. Please clean your equipment after fires.  

Training room has been set up for N95 masks, please place dirty masks on the right side front table with the posted note.

Boat trailer construction materials were gathered to build out a flat bottom on trailer.

One decon on Franklin 3-8

Hazmat training completed
Name Fraley/Olson
Email cfraley@washco-md.net
 
     
 
 

Thursday, June 4, 2020

Pass-On

 
 
  Pass-On
 
Date 06-03-2020
Pass-On Subject A-Crew
Pass-On Information Hose and Poffinberger:

    Equipment and SCBA's checked
   
    Reported to Meritus to help with hospital tents
         power washed both tents
         Rolled them up and transported to Phoenix
         Inflated both tents at Phoenix to dry
         hung tarps and ground tarps up to dry
   
    House fire  S. Mulberry st.
         Assisted with two out and overhaul
   
    Water rescue  Bass Rock
         Staged at lower 340 launch point
   
    Commercial building fire staged in man power  
         pool, then placed in service
   
    Inaccessible patient above dam 5 at the "wall"
         Cancelled in route

    Fueled: RS-201, BS-20 and UT-203
   
    UT-203 weekly check complete

    shift complete
   

   
Name Keith Hose
Email Khose@washco-md.net
 
     
 
 

Wednesday, June 3, 2020

Pass-On

 
 
  Pass-On
 
Date 06-02-2020
Pass-On Subject D-Shift, Tuesday June 2nd 2020
Pass-On Information -BS20 & BT20 checked

-0900-1100 hazmat training

-12:00 RS20-01 & U203 to DES to pick up chairs. Moved chairs from DES to the warehouse

-Picked up boat trailer at the warehouse and brought it back to the station for it to start getting looked at for a new set up.

-Went to MMC to pick up the HVAC trailer. Took it back to the warehouse.
Name McCoy/Shealy
Email amccoy@washco-md.net
 
     
 
 

Monday, June 1, 2020

Pass-On

 
 
  Pass-On
 
Date 05-31-2020
Pass-On Subject B shift pass on
Pass-On Information 20-01 check off completed
*right upper light head on light tower is out, needs new bulb.
20-01 was washed and fueled

house chores completed.
Name Clay Shealy
Email cshealy@washco-md.net