Thursday, October 31, 2019

Pass-On

 
 
  Pass-On
 
Date 10-30-2019
Pass-On Subject D-Shift: Wednesday October 30th 2019
Pass-On Information -U203 checked
-Apparatus checks
-0900-1330 tested all level A suits.
Total suits tested:17
Total suits passed: 12
Total suits failed: 5
-On the hazmat we now have the follow level A suits.  2-XL, 6-XXL and 4-XXXL
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Wednesday, October 30, 2019

Pass-On

 
 
  Pass-On
 
Date 10-29-2019
Pass-On Subject C-shift Pass On 10/29/19
Pass-On Information -All meters on HM20 calibrated after hazmat drill.

-Air unit filled all cylinders used during hazmat drill.

-6 A-suits airing out in training room.  S. Anderson advised he will be testing and placing back on HM20.

-4 MX6 meters re-calibrated again after TT hazmat fire on I81.

-2 pallets of speedy dry delivered and in U20 bay.

-BT20 adn BS20 checked with no new issues found.

-I could text Austin all this and speed up the process because he's the only other one that reads this.
Name Otter
Email EngineDriver71@comcast.net
Upload Photo 1.png
 
     
 
 

Sunday, October 27, 2019

Pass-On

 
 
  Pass-On
 
Date 10-26-2019
Pass-On Subject D-Shift:  October 26th 2019
Pass-On Information -Hazmat checked
-Inverter was not working again. Believe the power strip is bad. Used another power strip and now it's working fine.
-IT training
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Wednesday, October 23, 2019

Pass-On

 
 
  Pass-On
 
Date 10-22-2019
Pass-On Subject D-Shift: Tuesday October 22nd 2019
Pass-On Information -BT20 & BS20 checked
-Shealy: Hazmat research training
-Downstairs cleaned
-Table top exercise training
-The base station downstairs is now hooked up to the station amp and is running through the speakers. The old scanner has been turned off. This will help us hear transmission a lot better.
-About 250 gallons of fuel pumped into yard tank
-HM20 fueled and rinsed
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Tuesday, October 22, 2019

Pass-On

 
 
  Pass-On
 
Date 10-21-2019
Pass-On Subject 10-21 C-Shift Pass On
Pass-On Information -Gator and Collapse trailer weekly completed with no new issues.

-Meters on HM20 placed in Pelican box and moved to driver's side #2 compartment with other meters.  Compartment reorganized to fit meters.  Drum patch equipment moved to lower shelf and meters moved to middle shelf.

-Office area cleaned and items moved for better workspace.  Longer USB cable will be purchased to have printer/copier moved back by door.  Empty desk to be moved to Phoenix.

-MES serviced hydraulic tools.  Large ram from RS20-01 failed and taken for repair.

-Inverter on HM20 replaced.  Amperage increased due to multiple items charging.
Name Otter
Email EngineDriver71@comcast.net
 
     
 
 

Saturday, October 19, 2019

Re: Apparatus Maintenance Request - Austin McCoY

 
  Apparatus Maintenance Request
 
Name Austin McCoY
Date 10-19-2019
Email amccoy@washco-md.net
Unit HM20
Unit Status In Service
Description of Issue Inverter is OOS. Atlantic has a new one ordered. In order to used the things that are plugged into the power strip in the command area, you have to either have power going into the shore line port or run an extension cord into the cab.
 
     
 
 

Pass-On

 
 
  Pass-On
 
Date 10-18-2019
Pass-On Subject D-Shift: Friday October 18th 2019
Pass-On Information -RS20 checked. Cab raise will not work
-0900-1130 McCoy hazmat training
-Toilet paper and paper towels picked up
-Grass mowed
-Went to the warehouse to straighten stuff up
-Continued to sort and straighten up around the station
-2 spare chains for the Cutter's Edge saws are in black cabinet by the tool box
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Tuesday, October 15, 2019

Pass-On

 
 
  Pass-On
 
Date 10-14-2019
Pass-On Subject D-Shift: Monday October 14th 2019
Pass-On Information -Cutter's Edge chainsaw & Honda portable generator cleaned on RS20-01
-Gator & Collapse checked
-RS20-01 fueled
-Went to the fire store to order spare cutter's edge chains and pre filters
-Picked up an extension ladder from CO27 for PAT test
-Set up stuff at the training center for the PAT test
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Monday, October 14, 2019

Pass-On

 
 
  Pass-On
 
Date 10-13-2019
Pass-On Subject C-Shift: Sunday October 14th 2019
Pass-On Information -Equipment checks
-Continued to clean up the bay
-RS20-01 checked. Light tower not getting power to the controller
-RS20, RS20-01 & BS20 fueled
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Friday, October 11, 2019

EDIT: Pass-On

 
 
  Pass-On
 
Date 10-10-2019
Pass-On Subject D-Shift: Thursday October 10th 2019
Pass-On Information -Apparatus checks
- 0830-1300 training
-RS20 picked up, U203 dropped off at EVS for electrical issues
-Equipment placed back on RS20
-Grass mowed and trimmed
- With no other choice, we will have to use BS20 for towing trailers until U203 returns.
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Pass-On

 
 
  Pass-On
 
Date 10-10-2019
Pass-On Subject D-Shift: Thursday October 10th 2019
Pass-On Information -Apparatus checks
- 0830-1300 training
-RS20 picked up, U203 dropped off at EVS for electrical issues
-Equipment placed back on RS20
-Grass mowed and trimmed
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Pass-On

 
 
  Pass-On
 
Date 10-09-2019
Pass-On Subject C-Shift: Wednesday October 9th 2019
Pass-On Information -U203 checked
-House chores
-Equipment moved from station to phoenix.
-Cleaned up around the bay
-O2 off RS20 filled
-RS20-01 fueled
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Monday, October 7, 2019

Pass-On

 
 
  Pass-On
 
Date 10-06-2019
Pass-On Subject D-Shift: Sunday October 6th 2019
Pass-On Information •RS20-01 checked
•Work bench cleaned
•Misc. stuff done around the station
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Sunday, October 6, 2019

Pass-On

 
 
  Pass-On
 
Date 10-05-2019
Pass-On Subject C-Shift 10/5/19
Pass-On Information -HM20 weekly completed with no issues found.

-Extra 20/20 kits placed on HM20 in same compartment as sampling kit.

-Drager tubes moved to black Pelican case and placed with other Drager equipment.

-Supp203 threw a check engine light and seemed sluggish.  DJ notified.

-Missing 2 Motorola 8000 radios.  Might be on RS20 and were never taken off.
Name Otter
Email enginedriver71@comcast.net
 
     
 
 

Thursday, October 3, 2019

Pass-On

 
 
  Pass-On
 
Date 10-02-2019
Pass-On Subject D-Shift: Wednesday October 2nd 2019
Pass-On Information -U203 checked
-Rope drill
-Cleaned up from rope drill
-Cleaned up the loading dock and moved the equipment from the utility
-Hazmat washed
Name Austin McCoy
Email amccoy@washco-md.net
 
     
 
 

Wednesday, October 2, 2019

Pass-On

 
 
  Pass-On
 
Date 10-01-2019
Pass-On Subject 10-1-19 Pass-On
Pass-On Information -BS20 & BT20 weekly completed with no new issues found.  Oil level still high.

-New sampling kit placed in service.  Old, out of date test packets removed.

-Did training w/ HFD.  Slice pack not working.  Battery charge dropped drastically.  Placed on charge on RS20 but battery may need to be replaced.

-Oxy-Acetylene spare O2 needs replaced.  Used at HFD training.
Name Otter
Email EngineDriver71@comcast.net